AI proof of concept: how to run one that ends in a decision
Updated:
An AI proof of concept (PoC) is a small, time-boxed test that answers one question: can AI do this specific task well enough, on your own data, to be worth building properly? You run it on real past cases where you already know the right answer, against a pass mark written down before it starts, and it ends on a set date with a decision: go ahead, adjust and test again, or stop. It is not a demo and not the first version of the product. It has no screens and no live connections, and it should take weeks, not months. Most AI proofs of concept that never lead anywhere were missing one of those things: a written question, real data, a pass mark or a decision date.
What is an AI proof of concept?
It is the cheapest way to remove the one uncertainty that matters most in an AI project: whether the AI gets the work right often enough. Connecting systems, building screens and handling every exception are known work; a developer can estimate them. How well a model reads your invoices, sorts your customer emails or answers from your documents can only be found out by trying it.
So a good AI PoC tests that and nothing else. It doesn’t test:
- Whether the integration works. Data goes in from a file and results come out to a spreadsheet.
- Whether people like the interface. There isn’t one yet.
- Whether it pays off. The PoC gives you the accuracy and the time per case you need to work that out; AI ROI shows how.
Proof of concept vs prototype vs pilot vs MVP
The four words are often used as if they meant the same thing. They answer different questions, and running the wrong one is a common reason projects stall.
| The question it answers | Who uses it | What it runs on | |
|---|---|---|---|
| Proof of concept | Can AI do this task well enough on our data? | The team testing it, and the person who scores the results | Real past cases with known answers, offline |
| Prototype | What would using it look like? | A few future users, to react to | Sample data; often a clickable mock-up |
| Pilot | Does it work in daily work, and does it save what we hoped? | The people who do the work, on live cases, with a person checking every result | Live data, connected to the real systems |
| MVP (minimum viable product) | Is this worth rolling out, or worth selling? | Real users, without close supervision | Production systems, with support and monitoring |
For an internal process the usual order is PoC, then pilot, then rollout. A prototype only earns its place when people will use a new screen and its design is in doubt. “MVP” comes from building products for customers; for automating your own work, the pilot plays that role.
When do you need an AI PoC, and when can you skip it?
Run one when how well the AI performs is the main thing you don’t know, and a full build would cost real money. Skip it when:
- A tool already does the job. Use its free trial on your own cases instead. That is a proof of concept with no build.
- The task follows fixed rules. If every case is the same, a plain rule or automation does it without AI, and there is nothing to prove.
- The whole build is small. If building it properly costs about as much as testing it, build it, with a person checking results at first.
- The process isn’t worth it either way. A task done a few times a month rarely pays for any AI. The AI readiness checklist helps you find one that is.
How to run an AI proof of concept
- Write the question in one sentence. “Can AI sort incoming support emails into our eight categories and pull out the order number as reliably as the person who does it today?” A question you can’t answer with yes or no is not ready.
- Collect real cases with known answers. Take them from past work, including the messy ones: scanned PDFs, emails in two languages, the customer who writes three questions at once. If the right answer was never recorded, the person who does the work labels a sample first. If the cases contain personal data, check which provider may see them; GDPR and AI covers what to look at.
- Set the pass mark before you start. A share of cases right, the mistakes that are never acceptable, the time a person needs to check each result, and the cost per case. Write down what you will do at each outcome.
- Build the narrowest thing that answers the question. A script or an automation that takes a case in and writes the result to a spreadsheet. No screens, no live connections, no exception handling beyond logging what failed.
- Run it and score it blind. The person who does the work today marks each result right or wrong, ideally without knowing which ones the AI found hard. Keep the wrong ones; they show you what a real system has to handle.
- Decide on the date you set. Pass: plan the pilot. Close: change one thing, such as the instructions, the model or the data you give it, and run the same cases again. Clear fail: stop, and write down why.
The pilot that follows a passed PoC, and the rollout after it, are covered in how to implement AI in a business.
An AI proof of concept template
One page is enough. Here it is filled in for the support email example:
| Field | Example |
|---|---|
| Question | Can AI sort incoming support emails into our eight categories and pull out the order number as well as the person who does it today? |
| Why it matters | About two hours a day go on sorting. If it works, the next step is a pilot that sorts live email with a person checking. |
| Test cases | 300 emails from the last three months, picked at random, with the category the team gave each one |
| Pass mark | Right category on at least nine in ten; order number right whenever there is one; no complaint ever marked as routine |
| Not tested | The connection to the mailbox and the helpdesk, the screen for checking, live volumes |
| Who scores | The support lead, who sorts the email today |
| Time box and budget | Three weeks; a fixed cost agreed in writing; model usage capped |
| Decision date | The day after the last results are scored |
| If it passes | A four-week pilot on live email, and the AI ROI worked out from the PoC’s numbers |
An example to copy, not a client’s project. Set your own pass mark from what a mistake costs you.
The pass mark is the field people skip, and the one that decides whether the PoC ends in a decision. Set it from the cost of a mistake: where a wrong answer is cheap to spot and fix, a lower share right can still save a lot of time; where one wrong answer reaches a customer or the accounts, the bar is higher and a person keeps checking.
How long does an AI PoC take, and what does it cost?
A focused proof of concept usually takes a few weeks. If it needs months, it is probably testing several questions at once, or it has become a pilot without anyone saying so. The cost is mostly people’s time, not the AI:
- Preparing the cases. Finding them, removing what shouldn’t be sent out, and labelling the right answers if nobody recorded them.
- Building the test. Little for a task the model can do from instructions; more when it has to search your own documents or combine several sources.
- Scoring. Hours of the person who knows the work, and the one part you can’t hand to an outsider.
- Model usage. For a few hundred test cases, usually small next to the hours above. Measure it per case anyway, because at full volume it becomes a running cost.
If someone else builds it, agree in writing on the question, the pass mark and the price before work starts, and that the code, the prompts and the results are yours afterwards.
Why AI proofs of concept stall
Plenty of AI projects end at the proof of concept. In July 2024 Gartner predicted that at least 30% of generative AI projects would be abandoned after the proof of concept by the end of 2025, citing poor data quality, inadequate risk controls, escalating costs or unclear business value
Gartner. Being stuck between a promising test and a working system has a name: pilot purgatory. The usual causes:
- No question, so no answer. “See what AI can do with our documents” always produces something interesting and never a decision.
- Demo data. Clean examples pass. Real input is messier, and the problems appear only after launch.
- A pass mark set afterwards. If “good enough” is decided after seeing the results, every result is good enough or none is, depending on who is asked.
- A test that can’t become a system. A clever demo built in a tool you can’t connect, monitor or keep within your data rules has to be rebuilt from scratch.
- Nobody planned the next step. No owner, no budget for the pilot and no one to run it afterwards.
- Costs at full volume never checked. Cost per case looked fine on 100 cases and nobody multiplied it by a year.
From proof of concept to production
A passed PoC proves the AI can do the task. Getting it into daily work adds everything the PoC left out on purpose:
- Connections to the mailbox, the accounting system, the helpdesk or wherever the work arrives and ends up.
- Exceptions: what happens to the cases the AI gets wrong or can’t read, and who sees them.
- Approvals: where a person confirms before anything goes out, and how that is reduced as trust grows.
- Logs and monitoring, so someone notices when results get worse after a model or a supplier’s format changes.
- An owner who watches the results and decides on changes.
The next step is a pilot on live work, measured against how the process runs today. For the kinds of processes that usually reach that stage, see AI automation examples by department.
What vSites does
In AI consulting we go through how your team works and tell you in writing which processes are worth handing to AI, which aren’t and what each would cost, as a fixed-price plan. Where the main doubt is whether the AI can do the task well enough, that plan can start with a small test on your own cases, with the question and the pass mark written down. If you go ahead, the same developers build the full AI automation, so the test is made with production in mind. If the test says no, we tell you, and you stop there.